Schedule

MENG 433     Fall 2002

Presentations / M   4-6:55 

Casting Process
No. Of students
Lab Date
Studednt Name
Sand Casting
2
16-9-2002
M. Wagih/M. Naguib
Centrifugal/Spin casting
1
16-9-2002
Moataz Attallah
Investment Casting
1
16-9-2002
Khalil
Squeeze casting
1
16-9-2002
Fteis
Lost foam process
1
23-9-2002
Dalia Elhadidy
Permanent Mold Casting
1
23-9-2002
Walid ElGazzaar
Vacuum casting
1
23-9-2002
Amir Hussein
Die casting: hot chamber
1
23-9-2002
Hashem
Die casting: cold chamber
1
23-9-2002
Fahmy2

Requirements:

1.      Description of the process (use clarifying figures)
2.      Uses and applications (cast material/s, type of products)
3.      Advantages ov er other casting processes and limitations
4.      Common defects of the cast.

Presentations will start on the 16th of September in the lab session

Each Lab session allows for 4/5 presentations, 30 min each including questions.
Use Power Point or transparency presentations, preferably colored.

You are responsible for arranging f or the laptop, data show, or overhead projector.

Attendance and participation is obligatory.
Back to Main Page

 Maintained by: Eng. Moataz M. Attallah
© The American University in Cairo